MTA NYCT - 14th Street Station Complex ADA Upgrades and State of Good Repairs

(New York, NY)

Owner: MTA NYCT

Project Cost: $ Various

The goal of this Project is to provide ADA accessibility and state-of-good repair improvements at the 14th Street Station Complex in the Borough of Manhattan. The Work of this Contract includes the design and construction for ADA improvements at the 14th Street Complex, including elevator installation and ADA path-of-travel improvements, and the associated state of good repair work. The Project improvements, including the installation of elevators and other ADA improvements, are to result in fully ADA-compliant vertical transportation with long-term reliable service assured through the achievement of key performance metrics set forth in the related Elevator Maintenance Contract, which will require a consistently high level of service to be paid for through a stable, performance-based payment structure. The Work will be performed in an active subway environment and will require coordination with NYCDOT. The Canarsie Line (L) extends from 1st Avenue to 8th Avenue in Manhattan and intersects with northbound and southbound lines at 14th Street. The following stations will be made ADA accessible through this Project: the Sixth Avenue Station at 14th Street (L), the 14th Street Station on the Sixth Avenue Line (F/M), and the 14th Street Station on the 7th Avenue Line (1/2/3).

In addition, state-of-good repair work will be performed at the 8th Avenue and 14th Street Station, where the A/C/E Line intersects with the Canarsie Line. This Station is currently ADA-accessible. The Design-Builder will also perform state-of-good repair work along the entire Canarsie Line in the Borough of Manhattan.

Responsibility:

Jois Construction Management is responsible for Project Control Services: Scheduling and Estimating during the Construction Phase.

Estimating: Jois Construction Management is responsible for reviewing drawings, documents and preparing cost estimates.

Scheduling: JCMS is responsible for reviewing and analyzing the contract’s schedule and submitting the schedule review report to CCM based on the project baseline schedule and the latest schedule, based on the discussions and documents provided by CCM.